


Prepared Pad for High Ground Water Table
Prepared building pad on a property with a high ground water table, graded and compacted to provide stable support and manage subsurface conditions prior to construction.
Multi-Utility Trenching
Underground trenching to connect electrical service, water supply, and insulated heat lines between an outdoor wood boiler, barn, new home, and detached garage, with planning allowances incorporated for future expansion.


Underground Electrical Service
Trenching for underground electrical services from the road to a new residence, carefully planned to coordinate with site layout and future construction.
Slab-on-Grade Surface Preparation
Rock breaking and grading to create a level, stable surface for a slab-on-grade home with no basement, ensuring proper bearing and drainage prior to construction.
.jpg)
Planning a project?
Proper clearing and grading set the foundation for everything that follows. Sequencing, drainage, and access need to be considered early to prevent avoidable issues during construction.
​
If you're preparing for a new build, improving access, or addressing site conditions, a site visit is typically the best starting point.
Here's what to expect:
-
We review your property and intended scope of work.
-
We assess grading, drainage, and access.
-
We outline our recommended approach and next steps.
